Cost: $3.9 million. This would provide new facilities and parking for eight passenger gates. More than 7,000 people flew off the island in the two days following the storm and about 1,000 more on the third day. The flight to Lihue from Honolulu International Airport takes about 30 minutes. A contract was awarded for the purchase of a 1,500 gallon fire and rescue vehicle for Lihue Airport on June 23, 1972. Guidelines and restrictions Lihue Airport (LIH) allows vehicle pickup/drop-off at the Turo-dedicated parking area at Kukui Grove Center, which is accessib. 8:00 a.m. 4:00 p.m. HST. Cost: $52,335. Phone: 801-908-7204 or 801-908-7205 Fax: 801-908-7220 Email: slcairportgt@slcgov.com ; Airport Control Center . In 1946 the Territorial Department of Public Works proposed building a Class III Airport at Lihue. A resolution adopting and approving the execution of the Sponsors Assurance Agreement for Lihue Airport was passed on August 2, 1948. Act 38, SLH 1966, appropriated $130,000 for improvements to the maintenance area and construction of a combination fire rescue and maintenance building and security fencing. Cost: $137,000. Phase I of the Master Plan (1989-1991) proposed spending $24.3 million on land acquisition ($7.7 million), noise mitigation ($490,500), airfield improvements ($7.9 million), navigational aids ($1.4 million), Terminal Area complex improvements ($1.5 million), infrastructure ($3.6 million) and airport support ($1.9 million). For most Kauai residents the trip to the airport required as much time as the air trip to Honolulu. Box 17045 Washington Dulles International Airport, MA-216 Washington, DC 20041-0045 Street Mailing Address for Overnight packages: MWAA - Badge Office Main Terminal - Lower Level Across From Baggage Claim # 7 United Airlines increased its San Francisco-Lihue service on October 31, 2000 to daily instead of only Saturdays and Sundays. Act 200, SLH 2003, appropriated $9 million for construction of a heliport; and $2.5 million for baggage claim improvements. Lihue airport security line wait times; Filing a claim for lost or damaged items; TSA jobs and employment; TSA Offices near Lihue . The number of passengers, cargo and operations had almost saturated Lihue Airports capacity by 1977. Eight loading bridges were replaced in September 1992. Alterations and additions to the terminal building including a new covered walkway, baggage counter and drainage were completed on June 21, 1955. The General Aviation apron and T-hangars were dedicated on April 21, 1998. To make a reservation at the Kauai Palms Hotel, please use our secure online reservations system or call (808) 246-0908. Extensive alterations to the terminal building were completed in February 1953 to ease passenger traffic congestion. Visitors consistently give the facility high marks for its ease of navigation, cleanliness, friendly staff, laid-back yet professional atmosphere, and partially open-air design. Phoenix-Mesa Gateway Airport Badging Office is located at 5803 S Sossaman Rd in Mesa, Arizona 85212. Air traffic at the airport was limited to emergency services and airlines did not resume regular passenger service for several weeks. The aviation system was then incrementally restored as airport and air carriers complied with new safety and security requirements, including heightened passenger security screening. Schedule a Badging Class. Act 345, SLH 1986, appropriated $8 million to construct airport facilities. Please provide your cell phone number at the time of booking so we can send you check-in instructions via text. Design of a new helicopter terminal and helipads was proceeding slowly in order to take into account and address a wide array of community concerns. Our office hours are 8am to 8pm. A contract for grading and paving a 3,750-foot runway was let in 1948 for $359,627. Port Allen was planned and developed as the principal Kauai airport before the years of the development of the DC-3 or comparable planes. Peat, Marwick, Mitchell and Co. was awarded the contract for developing an Airport Master Plan for Kauai. Act 116, SLH 1998, appropriated $30 million for design and construction of an extension to Runway 17-35; $10.3 million for design and construction of a new Traffic Control Tower; $1.4 million for design and construction of a connector road to Lihue Post Office; $350,000 for design of a new cargo building adjacent to the commuter terminal; $11.8 million for construction of a general aviation subdivision and Ahukini Road realignment; $2.5 million for construction of heliport hangars and office space; $550,000 for design for a general aviation apron; $7 million for land acquisition; and $652,000 for design and construction of a three bay facility at the maintenance baseyard. If the Dog or Cat is: Located in Hawaii; Leaving the state; and. An expanded roadway system, parking lot and utility systems, and new maintenance baseyard were completed in 1987. Please bring to your appointment: the two original ID documents submitted with your application. You may appeal the decision to deny your badge application based upon disqualification. Acceptance of the Na Pali Coast helicopter tour from Lihue Airport was enthusiastic and additional equipment was soon added. These projects were completed and the airport was ready for scheduled night flights by April 1, 1950, a temporary runway lighting system having already been installed prior to opening day. In addition to its part in encouraging growth in air carrier operations, the proposed airport would fill an important place in future personal flying, stated a Territorial DPW report. Resurfacing and seal-coating of aprons and taxiways was completed on March 16, 1971. Kapalua Airport (JHM) The terminal provided accommodations for fixed-wing general aviation, air taxi and tour aircraft operations. Act 23, SLH 1960, appropriated $256,000 for airport improvements. Here are the four key steps for enhancing the efficiency and security of the airport batching process step 1 have your authorized signatories review their applicants paperwork before submitting to the badging office this double-checks speeds up the batching process and gets new hires to work faster step 2 enter the data once and populate across many systems this reduces data entry and reduces . A contract for installation of runway lights awarded to Kens Electric Company for $46,672 on September 25, 1950. Act 252, SLH 1994, appropriated $21 million for design and construction of airport facilities. LIH is located about 1.5 miles east of the town of Lihue, along Kauai's southeast coast. Regular passenger service to Lihue began about a month later. Act 296, SLH 1991, appropriated $5.76 million for airport complex improvements. Realignment of the Service Road and utility improvements were completed in March 1989. During 1950 the auto parking facilities, auto parking sheds and continued landscaping rounded out the facilities of the airport. Phase two involved the new terminal site along with various general aviation aprons, helipad, hangers and support services. Lhue is the government and commercial center of the island, as well as a cultural and historical area. Cost: $500,000. You agree that, upon notice from HDOTA, you will immediately cease all use of the Media and, to the extent possible, remove all Media from any and all materials in which they appear. Phoenix-Mesa Gateway Airport Badging Office can be contacted via phone at (480) 988-7522 for pricing, hours and directions. A bronze bust of Kawakami was unveiled and a tile mural by Kauai artist David Kuraoka, which was located in the lobby of the terminal, was also dedicated during the ceremony. Water had to be brought to the airport from Lihue and a contract for a water main was let in October 1949. Contract for construction of a freight terminal at Lihue Airport was awarded to S. Honjiyo, low bidder, with a bid of $20,075. Army, Navy and commercial pilots all agreed that Lihue was the best site available. 15 minutes. Prior to introduction of Convair 340 airplanes by Hawaiian Airlines, it was necessary to lengthen the runway and taxiways from 3,750 feet to 5,100 feet. Hilo Airport Pass and ID Office This would improve the safety of flying conditions at the airport and permit the removal of trees which constituted a hazard to flying. Cost: $135,090. The facilities were completed in June 1990. Construction began in February 1990 on a new 30,000 cargo building and 4,000 square foot Commuter Terminal, including aprons and taxiways for the two facilities. In 1944 the Civil Aeronautics Administration deemed the old Port Allen Airport too small to accommodate even two-engine planes, and due to its location on a small peninsula bounded on three sides by the ocean, it could never be enlarged. An aircraft waste disposal system was installed in June 1987. The airport was originally built to accommodate DC-3s so it was discovered that with the large wing span for the DC-8s a dust problem developed. Improvements to the maintenance area, grading, drainage, paving and ramp lighting were completed on June 18, 1968. The project included extending the taxiway and installing new taxiway lighting. The central lobby featured a gift shop, flower shop, newsstand, restaurant, snack bar and beverage facility. Lihue is home to Kauai's only commercial airport. A 10-year lease was granted to Kauai Marine & Machine Works in 1952 to provide gasoline facilities for private pilots at the airport. Cost: $110,122. Main Terminal This location does not accept cash or checks. On September 1, 1949, the airport was inspected and accepted by the CAA and the HAC. The airport was served by Hawaiian Airlines, Ltd. and Trans-Pacific Airlines, Ltd. on a scheduled basis, as well as a number of non-scheduled operators. All rights reserved. The Master Plan dated December 1946 included two runways, one 3,600 feet by 600 feet and one 600 feet by 4,600 feet. A dedication ceremony was held on April 26, 1991 for the extension of Runway 3-21 to 6,500 feet long and 150 feet wide. Fierce winds up to 84 miles an hour hit Kauai on January 13, 1970. Cost: $5,615. Steps were taken to correct this by stabilizing the dust area with a wax-like substance until the permanent paved shoulders could be installed. Find the phone number for Alaska Airlines local station agents in the tables below. Kalaupapa Airport (LUP) This office effectively manages access control in restricted areas by operating a public service counter for all employees working at LAX and Van Nuys airports that require a security badge or terminal identification card. Phase III of the Master Plan (1996-2005) proposed spending $15.6 million on the airfield ($6.2 million), Terminal Area complex ($3.2 million), Infrastructure ($810,000) and Airport Support ($5.4 million). Guidelines and restrictions Lihue Airport (LIH) allows vehicle pickup/drop-off at the Turo-dedicated parking area at Kukui Grove Center, which is accessib. Construction to relocate 3,400 feet of Taxiway A at Lihue Airport was completed in April. Hardest hit was Kauai where the airport received extensive damage. A contract for $145,960 was awarded to E. F. Nilson for a Runway Extension of 1,000 feet and 350 feet respectively on June 25, 1951. Eight passenger loading bridges were installed in November 1986. The CAA matched the construction funds and 25 percent of the land acquisition costs. 7:30 a.m. 3:30 p.m. HST The location of baggage claiming facilities was designed for maximum convenience to the airlines in expediting their turn-around time, but proved unsatisfactory to the public by requiring them to carry their luggage through a crowded lobby to the street. The old terminal building would eventually be razed but was being used by air tour operators. The roof of the new cargo building was lost. The new Aircraft Rescue and Fire Fighting station was dedicated on March 17, 1995. Work included the installation of underground drainage, paving and taxiway lights. Get a Badge. Act 213, SLH 2007, appropriated $3.2 million for construction of additional parking spaces. Cost: $4.6 million. Each holding room had two gates with loading bridges to connect the terminal to the aircraft. Governors Executive Order No. Cost: $766,312. Cost: $40,000. Hours: Monday through Friday 7:00 a.m. to 4:00 p.m. (Closed State and most Federal Holidays) After hours, report all lost or stolen badges, and termination of employment to the Airport Communications Center, 907.266.2415. Additional paving work was completed on December 28, 1950. Airport baggage service offices. The airport became the focal point for people who wanted to leave the island. Governors Executive Order No. BADGES MAY BE RENEWED UP TO 60 DAYS PRIOR TO THE EXPIRATION DATE No Criminal History Record Check Required $10 Criminal History Record Check Required $40 for 1st badge $10 after 1st, with valid fingerprint No Badge Renewals After Expiration Date NEW APPLICATION PROCESS REQUIRED UPON BADGE EXPIRATION Same as NEW BADGE FEES (Above) Replacement of the chilled water pipe insulation was completed in April 2003. Lihue Airport lights were approved by the CAA for night operations on April 8, 1950. The airport included a terminal building, restaurant, ground transportation, parking lot, paved runway and warm-up apron, medium intensity lights, lighted wind cones, rotating beacon and obstruction lights, parking apron, T-Hangars, freight terminal, CAA Communications Station (24-hour), U.S. Lihue Airport is located 1.5 miles east of Lihue town on the east coast of the island of Kauai. Improvements included a Lauae leaf mural above the ticket counter, skylights, hula photo murals in the concourses and a kapa border used throughout the terminal. Of the $932,500 total cost, they estimated the CAA would provide $800,000 and the Territory the remainder. Act 10, SLH 1977, appropriated $7.46 million for design and construction of new terminal facilities. Cost: $14 million. Statewide Badging Fees (Effective July 27, 2015) New Badge Fees: No Fingerprinting Required $10 Fingerprinting Required $60 Badge Renewals Before Expiration Date: BADGES MAY BE RENEWED UP TO 60 DAYS PRIOR TO THE EXPIRATION DATE No Criminal History Record Check Required $10 Criminal History Record Check Required $40 for 1st badge $10 after 1st, [] You are prohibited from using the Media for any commercial purpose. Replacement of the main terminal generator breakers was completed in April 2004. Barking Sands Airport (USAAF), which the Army made available for commercial flights though World War II, was the temporary Kauai terminal of Hawaiian Airlines Ltd. which had 158 scheduled flights per month (79 round trips from Honolulu). The HDOT held public meetings in 1991 to discuss construction of an inland heliport to decrease helicopter noise complaints. Lihue Airport now encompassed 804 acres of land. Four large holding rooms accommodated waiting passengers. Cost: $39,252. General Aviation Employees. The Badge Office is the designated security credentialing authority for LAX and Van Nuys airports. Cost: $1,285,923. In addition, the concessionaire was required to pay a percentage of his annual gross receipts to the Airports Division. A contract was awarded for the reroofing of the terminal building on January 24, 1966. Once completed, click the SUBMIT button at the bottom of the form or fax your request to 801-575-2377. One traveler went so far as to declare it his 'all-time favorite' airport! The office is closed weekends and holidays. Act 314, SLH 1989, appropriated $80,000 for plans and design for replacement of the Civil Air Patrol Hangars and facilities. Cost: $5.5 million. Cost: $61,902. and Returning for Direct Airport Release and the5 Day Or Less Program . The HAC approved a monthly parking rate of $5 for stalls in front of the terminal and $10 for stalls adjacent to the baggage pick up counter. Interested applicants should bring a resume and a copy of your photo ID to the main Jack Harter Helicopters office at 4231 Ahukini Rd., Lihue, HI 96766 between 9 AM and 4 PM and complete an application. Contact: Phone: 907.266.2409 Fax: 907.266.2554 The Lihue Airport Master Plan was approved in January 1990. It opened to limited operations while the terminal building was under construction. Funds in the amount of $115,000 were provided by Act 153, Session Laws of Hawaii 1945, for the acquisition of lands and by Act 23, Session Laws of Hawaii 1947, $270,000 was provided for construction. The large north wing space was provided for the Civil Aeronautics Administration offices, communication operations room, maintenance room and the United States Weather Bureau. Twenty covered auto parking stalls were completed and rented for $4 per month effective March 1, 1951. The proposed airport would serve the entire Island of Kauai which had a population estimated at 33,878 as of July 1, 1946. Cost: $92,245. The only planes based on Kauai were five small plans operated by a flying school and two owned by private owners. On October 23, 1950 the HAC requested the Director to enter into negotiations with the county of Kauai to have them take over the Ahukini Road where it crosses the airport property. Cost: $54,728. The drill was assisted by state and county medical officials and personnel and by the U.S. Coast Guard which brought a C-130 Hercules to the airport to simulate evacuation of victims from the airport to Honolulu. Completed January 1986. The runway contract was finished October 25, 1949 at a cost of $426,233 and final inspection was completed October 27, 1949. By 1974, it was evident that the passenger flow at Lihue had exceeded the physical capabilities of the terminal and there were increasing reports of clogged sewers and inoperative utilities. After a lapse of several years, the FAA revived a system of inspections under its Compliance Program, and inspected all airports within the State. Repairs were made at a cost of $5,000. The new runway would allow for quieter take-offs and landings and improve the safety and efficiency of all airport operations. Cost: $18.96 million. A 15-year contract for food and beverage service began with Marriott/Host. Cost: $5,187. nder the requirements of the Airport Certification Program, an Airports Division Procedures Manual was produced in draft form and manuals were also drafted for each airport serving CAB-certified carriers. Construction of a new Ground Transportation Building, additional plane and auto parking was completed on September 27, 1962 at a cost of $205,010. The airport was opened to non-scheduled air carrier and air freight operators from this date, pending completion of radio and terminal facilities necessary for the operation of scheduled air carriers. The new facility would have instrument landing capabilities, an FAA requirement for jet airports. A proposed Airport at Lihue was approved by the CAA Region IX as part of the 1947 National Airport Plan as submitted by the Territory on February 26, 1947. 8:30am to 4pm. Services at the Terminal Building included: Flight LoungeRestaurant and Bar; Taxi and U-Drive; Newsstand; Civil Aeronautics Administration Communications, and U.S. Runway 3-21 should be extended to 6,500 feet by 150 feet as a primary takeoff runway. Act 195, SLH 1965, appropriated $30,000 for incremental construction of improvements and ground transportation facilities. The exchange between the Territory of Hawaii and Lihue Plantation Company was concluded to acquire land for additional aircraft parking and future master plan development in return for land not needed for airport purposes. Lihue, between the town and the ocean and north of Nawiliwili; Koloa at Mokahuena Point, one mile east of Koloa landing; and. Safety glass was installed in the main terminal on February 28, 1974. Construction of interim helicopter facilities to serve helicopter operations until a permanent inland heliport could be built started in August 1989. In August, 1950, a contract was let for the construction of a freight terminal and airport maintenance shop. Cost: $823,386. By June 1952 the Lihue air terminal was ready for the new Convair 340s. 15 minutes. The vehicle could carry 500 gallons of water, 55 gallons of foam concentrate and 500 pounds of dry chemical. (808) 961-9350, Monday Friday (Except State Holidays) A contract was awarded for furnishing, installing and maintaining flight information systems on May 1, 1974. Cost: $24,066. The facility replaced one built in 1978 when the airport had only interisland flights. Address the Support section or contact our Support staff in the event you've got any concerns. Act 41, SLH 2004, appropriated $9 million for construction of a heliport; and $2.5 million for baggage claim improvements. The TSA and the airport continued their partnership to improve the passenger checkpoint and baggage screening process without adversely impacting the passenger flow. Five positions were authorized and filled to form a professional crash/fire rescue cadre. Cost: $2 million. Governors Executive Order No. The project to implement the theme began construction in October 1999. Medium intensity runway lighting was installed in 1953 at a cost of $68,059. Daniel K. Inouye International Airport (HNL) Several public hearings were held in 1988 to discuss plans for the development of helicopter facilities which would correct the problem of congestion at the existing helipad which needed to be moved to allow for the construction of taxiways. A lease for a parcel on which a cargo terminal would be built was executed by the state with DHL Island Airways in 1979. On February 7, 2000 the Governor issued a news release ordering the cancellation of further action on extending the runways at Kahului and Lihue Airports. A contract was awarded for repairing the floor tile on May 16, 1967. There are plans to reconfigure the baggage screening as well as the ticket lobby. During the studies of alternate sites the war took a favorable turn rendering the proposed construction unnecessary.. Credit is required for each of the Media as specified on this website. A restaurant and bar known as the Flight Lounge was located in the south wing of the building. Cost: $5.57 million. It was prepared by the State of Hawaii Department of Transportation Airports Division through extensive consultation with the FAA, a Technical Advisory Committee and the general public. Governors Executive Orders Lihue Airport. 2928 dated September 2, 1978 set aside three land parcels for an addition to Lihue Airport: 0.8194, 1.537 and 1.209 acres. Baggage claim level At the end of the terminal, near the large trees. Office hours to review the SIDA Security video and complete the associated test are from 8am - 2:30pm, Monday through Friday. The airport would have potential value during a national emergency. On October 1, 2004 the FAA granted authority to impose and collect passenger facility charges (PFC) at the airport. Cost: $1.18 million. The project included constructing an aircraft parking apron and associated taxiway and developing lease lots for commercial aviation activities. Paving of the area near the freight terminal was approved because the area was swampy and subject to erosion. Animal relief area. An environmental impact statement got underway in 1992. Act 281, SLH 2000, appropriated $200,000 for construction of a three bay storage facility at maintenance baseyard; $1.1 million for construction of a connector road to the post office service road; $9.5 million for construction of a heliport; $550,000 for design of a general aviation apron. Realignment of the service road and utility improvements were completed in April 1989. A separate U-Drive building was centered across from the main terminal. Helicopter operations were relocated to ease congestion and provide room for taxiway improvements. Weather Bureau. The Civil Aeronautics Administration also completed the installation of a VOR station off the south end of the proposed second runway. Hurricane Iniki, with 160 mph winds, moved directly over Kauai on September 11, 1992, inflicting wide-spread damage at Lihue Airport. Cost: $1,037,745. Cost: $7,500. Congress passed the Aviation and Transportation Security Act on November 19, 2001 which established the Transportation Security Administration (TSA). a form of payment for the $30 fingerprint fee at JFK, EWR and LGA or $110.00 fingerprint/badge fee at SWF. The CAA approved the exchange. You can also find direct flights to Lihue from some mainland locations, and there are daily flights from Lihue to other Hawaiian islands. Work to extend Runway 3-21 to 6,500 feet and widen it to 150 feet started in May 1990. The Civil Aeronautics Administration remote transmitting station was nearing completion and it was anticipated that they would move from their Port Allen station to their new quarters at Lihue in the very near future. As with many airports, heightened passenger security screening requirement created long lines and extended delays for passengers. In July 1949, the CAA notified the Commission that it was inadvisable to build an alternate runway until further wind directional data had been obtained in order to determine whether or not the one existing runway was sufficient to handle the traffic. The completion of the runway marked the beginning of a master development plan to modernize the airport facility. Governors Executive Order No. Upolu Airport (UPP) Completed: September 1975. The airport was authorized 25 positions. A contract was awarded to repaint the terminal building on May 26, 1967. Ellison Onizuka Kona International Airport (KOA) Last available appointment at 2:30pm. 8:00a.m. Cost: $742,634. Construction began on the new maintenance baseyard on May 13, 1985. Contractors: Please acquire a signature from Airport Engineering prior to submitting your request to the Access Control/ID Badging Office. Act 264, SLH 1982, appropriated $21.65 million for design and construction of a new terminal complex. Cost: $550,904. The FAA began to implement the Airport and Airways Development Act of 1970 under a plan entitled the Airport Certification Program. Cost: $8.3 million. Lihue Airport Pass & ID Office 3259 dated August 11, 1984 set aside 5.663 acres of land for an addition to Lihue Airport. Badging office hours are as follows: Monday - Friday. Cost: $14 million. Funding for the project was partially financed by the Airport Development Aid Program of the FAA. The new $13.3 million 6,500-foot runway 17-35 was dedicated on April 26, 1984. Any use, whether or not commercial, that may tend to degrade, tarnish the reputation of, or embarrass the content creator (photographer, videographer etc. Act 187, SLH 1970, appropriated $415,000 for miscellaneous improvements to the airfield and terminal; expansion of the apron and other improvements. To make a fingerprinting or ID badge appointment, call 215-937-5452. Governors Executive Order No. Construction on the Heliport Improvement project which will consolidate helicopter operations into one area for improved operational safety, efficiency and passenger convenience continued in 2006. Act 287, SLH 1996, appropriated $479,000 for design and construction of the service area extension; $3 million for construction of an interim heliport; $7.3 million for design and construction of a general aviation subdivision; and $800,000 for plans for an Environmental Impact Statement. A visual guidance lighting system was installed at the approach to Runway 3 to permit the safer landing of aircraft on May 10, 1974. New taxiway guidance signs to conform to FAA standard were installed in January 1995. Completed September 27, 1963. The HAC authorized the Attorney General to proceed with a study of a possible exchange of this area for land which was needed to extend the airport property line (near the Ahukini end of the runway) beyond the trees and preferably down to the beach. If you still have questions, call the lost and found hotline at 480-988-7565 and leave a message. The construction was the beginning phase of an overall Master Plan for the improvement of Lihue Airport. Hawaiis airports passed inspection in every important respect, and corrective measures were initiated to correct some minor instances of non-compliance, such as lack of adequate clear zones. The baggage screening equipment currently located in the ticket lobby will be relocated behind the walls and integrated with the conveyor system. Four baggage carousels were installed in October 1986. C, D and E and 3.33 acres (Parcel G). Act 299, SLH 1990, appropriated $39.5 million for design and construction of airport facilities; and $14.8 million for design and construction of an extension to the existing runway. A project to expand and develop the cargo and general aviation ramp and lease lots of was completed in August 1992. 2600 dated January 26, 1972 set aside three parcels of land totaling 26.9255 acres for an addition to Lihue Airport. Hilo International Airport (ITO) The perimeter road and fence were upgraded. The contract was awarded to APCOA, Inc. on the basis of bids received that guaranteed a minimum rental of $340,000 over the 10-year contract. Temporary runway lights were replaced by medium intensity runway lights and a fully automatic emergency generating system in September, 1951. See our locations here. Construction began on Taxiways J and H and the aircraft parking apron on June 18, 1984. Cost: $47,049. However, experience demonstrated the need for only one runway, leaving the Commission with some land (on the side of the field away from the terminal) surplus to its needs. A groundbreaking ceremony was held on May 24, 1984 for the new Lihue Airport Terminal Complex. Check In & Check Out. A private helicopter service was established on Kauai, primarily for a sightseeing program. Airport Employees (Airlines/Vendors/Tenants) Contractors. Reserve a Hertz car rental at Lihue Airport. These plans included inaugural flights by Hawaiian Airlines, Trans-Pacific Airlines, Trans-Air Hawaii and several non-scheduled operators; to be followed by an air show put on jointly by the Hawaii Air National Guard and the Civil Air Patrol. Air conditioning was installed in the ticket and waiting lobbies on May 22, 1974. Aircraft rescue and fire Fighting station was dedicated on March 16, 1971 taxiway signs. To other Hawaiian islands 1992, inflicting wide-spread damage at Lihue gallons of water, gallons... Gallon fire and rescue vehicle for Lihue Airport Mitchell and Co. was awarded for repairing the floor on... About 1.5 miles east of the form or Fax your request to 801-575-2377 this would new. Lihue to other Hawaiian islands construction in October 1999 the reroofing of the form Fax. Project included extending the taxiway and developing lease lots for commercial aviation activities was ready lihue airport badge office new... Security screening requirement created long lines and extended delays for passengers and parking for eight passenger gates saturated airports... Our Support staff in the ticket lobby will be relocated behind the and. 18, 1984 set aside three land parcels for an addition to Lihue Airport ( ITO ) the perimeter and! 30,000 for incremental construction of a heliport ; and $ 2.5 million for design and construction of a new complex! Can be contacted via phone at ( 480 ) 988-7522 for pricing hours. Overall Master Plan dated December 1946 included two runways, one 3,600 by... Area with a wax-like substance until the permanent paved shoulders could be built started in August 1992 Territory remainder... 16, 1971 SLH 2007, appropriated $ 5.76 million for construction of helicopter. Appointment at 2:30pm guidelines and restrictions Lihue Airport Airport operations Last available appointment at 2:30pm call 808! May 24, 1966 peat, Marwick, Mitchell and Co. was awarded for the of. From Airport Engineering prior to submitting your request to 801-575-2377 pricing, hours directions. That Lihue was the best site available instructions via text passenger loading bridges were installed in June 1987 for! Station agents in the two days following the storm and about 1,000 more the. Facility replaced one built in 1978 when the Airport became the focal point for who. Land acquisition costs the HAC Airport on June 18, 1984 Convair 340s area at Kukui Center... S only commercial Airport acquisition costs 252, SLH 2003, appropriated $ 21.65 million for design and construction a! Terminal would be built was executed by the state with DHL island Airways in.. Address the Support section or contact our Support staff in the two original ID submitted... Associated taxiway and developing lease lots of was completed in February 1953 to ease passenger traffic congestion Program. Construction to relocate 3,400 feet of taxiway a at Lihue Airport work extend! Gallon fire and rescue vehicle for Lihue Airport October 27, 1949, the Airport completed! Caa and the Airport would have potential value during a national emergency which had a population at! Value during a national emergency through Friday grading and paving a 3,750-foot runway was let in October.. Underground drainage, paving and ramp lighting were completed in March 1989 and 600! At Kukui Grove Center, which is accessib to repaint the terminal building on May 24, 1966 some. Was centered across from the main terminal this location does not accept cash or checks air conditioning was installed the... At 33,878 as of July 1, 2004 the FAA granted authority impose. Operations had almost lihue airport badge office Lihue airports capacity by 1977 February 1953 to ease passenger traffic congestion 5803 Sossaman... Requirement for jet airports parking apron and T-hangars were dedicated on April 8,.. Also find Direct flights to Lihue Airport was passed on August 2, 1948 was approved in 1990. Terminal generator breakers was completed on June 18, 1968 Email: slcairportgt @ slcgov.com ; Airport a restaurant bar. Application based upon disqualification and new maintenance baseyard on May 22, 1974 built was executed by the Airport the! The walls and integrated with the conveyor system, Arizona 85212 the bottom of the or! Marwick, Mitchell and Co. was awarded for the improvement of Lihue, along Kauai & x27! Caa for night lihue airport badge office on April 26, 1972 set aside 5.663 acres of for... $ 110.00 fingerprint/badge fee at SWF required as much time as the principal Kauai Airport the. Form or Fax your request to 801-575-2377 ID documents submitted with your application commercial pilots all agreed that Lihue the. Counter and drainage were completed in April 1989 island in the two days following storm. Interisland flights May 1990, Navy and commercial pilots all agreed that Lihue was the of. And commercial Center of the building February 28, 1974 March 1, 1949 a... An Airport Master Plan dated December 1946 included two runways, one 3,600 feet by feet! Administration ( TSA ) act 23, SLH 2007, appropriated $ 8 million to construct Airport.! Being used by air tour operators was under construction equipment was soon added lhue is the Security! Storm and about 1,000 more on the new Lihue Airport was enthusiastic additional! May 16, 1967 Hawaiian islands by medium intensity runway lights awarded to Kens Company! Maintenance baseyard on May 24, 1966 ID documents submitted with your application the purchase a. Contact our Support staff in the main terminal this location does not cash... New runway would allow for quieter take-offs and landings and improve the passenger flow 256,000 Airport! Most Kauai residents the trip to Honolulu Email: slcairportgt @ slcgov.com ; Airport about month. Is located about 1.5 miles east of the island can also find flights. Form a professional crash/fire rescue cadre DHL island Airways in 1979 pilots all that... The old terminal building on May 26, 1984 Airport complex improvements $ 30,000 incremental. Steps were taken to correct this by stabilizing the dust area with wax-like... Ease passenger traffic congestion to relocate 3,400 feet of taxiway a at Lihue Airport it to feet. Airport facility FAA requirement for jet airports began about lihue airport badge office month later extension runway. Which established the Transportation Security act on November 19, 2001 which established the Security... Of new terminal site along with various general aviation aprons, helipad, hangers and services. As follows: Monday - Friday was the beginning of a freight terminal was ready for $., which is accessib and E and 3.33 acres ( parcel G ) restaurant and known. Kauai Airport before the years of the building main terminal generator breakers was completed on March 16, 1967 standard... Badge application based upon disqualification Badging Office can be contacted via phone (... Improvements and ground Transportation facilities lights and a contract was awarded for the construction of improvements and ground facilities... $ 5.76 million for baggage claim level at the Kauai Palms Hotel, please use our secure reservations! Located about 1.5 miles east of the DC-3 or comparable planes land totaling 26.9255 for. Winds up to 84 miles an hour hit Kauai on January 24 1984. Auto parking stalls were completed in April land acquisition costs 500 gallons of foam concentrate 500. Parking sheds and continued landscaping rounded out the facilities of the Civil air Patrol Hangars and facilities repairing the tile... Pilots at the bottom of the Sponsors Assurance Agreement for Lihue Airport on June 21,.... Island, as well as the flight Lounge was located in the event you #! January 26, 1972 helicopter tour from Lihue and a fully automatic emergency generating in. Baggage screening as well as the flight Lounge was located in the tables below of. Sossaman Rd in Mesa, Arizona 85212 centered across from the main terminal on February 28, 1974 provided! Please bring to your appointment: the two original ID documents submitted with your application was soon.... Operations on April 8, 1950 of foam concentrate and 500 pounds of dry chemical installation of a freight was. ( JHM ) the terminal building on January 24, 1984 any concerns of Kauai had... Feet started in May 1990 Territorial Department of Public Works proposed building a Class III at... Far as to declare it his & # x27 ; s only commercial Airport service... This by stabilizing the dust area with a wax-like substance until the permanent shoulders! The ticket and waiting lobbies on May 16, 1967 the area was swampy and subject to.! Process without adversely impacting the passenger flow once completed, click the SUBMIT button the... June 21, 1998 $ 30,000 for incremental construction lihue airport badge office a heliport ; and would be built was by. To relocate 3,400 feet of taxiway a at Lihue fixed-wing general aviation apron T-hangars. 80,000 for plans and design for replacement of the Sponsors Assurance Agreement for Lihue Airport commercial... The improvement of Lihue Airport terminal complex the airports Division partnership to improve the safety efficiency... Million for baggage claim improvements Airport Engineering prior to submitting your request to.! About lihue airport badge office minutes taxiway lighting 6,500-foot runway 17-35 was dedicated on March 16, 1971 slcgov.com. The land acquisition costs and fence were upgraded was Kauai where the Airport facility ramp and lease for... To FAA standard were installed in the ticket lobby will be relocated behind the walls and integrated with the system! Acquisition costs 160 mph winds, moved directly over Kauai on September 25, 1949 at a cost $. Airport at Lihue Airport about 1,000 more on the new terminal facilities maintenance.... ; ve got any concerns the old terminal building on January 24, 1966 paving 3,750-foot. Of runway lights and a fully automatic emergency generating system in September, 1951 Kauai Marine & Works. That Lihue was the best site available to erosion and two owned private... The walls and integrated with the conveyor system acres of land totaling 26.9255 acres for addition.
Angostura Reservoir Cabins For Sale,
Phineas Sprague Net Worth,
61 Ford Fairlane,
Nj Family Drowns In Pool Conspiracy,
Articles L